1Security analysis of air shaft coal pillar backfill miningHUANG Yu-cheng, HAO Yu-xin, LU Shao-qi, ZHAO Cheng-wei, YANG Tao1-3,62Optimization of technical specifications for shovel and truck in open pit coal mineWANG Yan4-63Selection and suggestions of mining method for C409 complex and hard-mining thick coal seam in Wangjiazhai Coal MineGAO Lin, LIU Yong, WU De-pei, YANG Fa-ming7-104Study on coal pillar size for gob-side entry driving in inclined coal seam downward miningCHENG Shi-xing, HUA Xin-zhu, CHEN Deng-hong, YANG Peng, WANG Xiao-hu11-145Design and construction technology of a new wall-mounted bunkerWANG Xing-kai, HUO Xiao-quan, XIE Wen-bing, ZANG Long, ZHANG Qian-long15-176Optimized design on head funnel of belt conveyor for large size coalLI Jun-feng, CUI Zhao-xia, ZHOU Ning, QI Xiang-dong, YANG Tao18-20,237Arrangement schemes for big inclined wall of column-supported silo in coal preparation plantCAO Rong-kui, ZHANG Wei-jie21-238Research on head sheave platform arrangement of mine head frameSHI San-yuan, YUAN Rui-yang, LI Guo-li24-269A comparative study on the mix proportion regulations of shotcrete in China, the US and EuropeXIAO Wei, CHEN Lian-jun, PAN Gang27-3010Research and application of support technology for large section roadway in extra thick coal seamMAO Huai-yong31-3411Composite support technology of soft coal roadway with large loose zoneGUO Jiang-tao35-37,4112Surrounding rock reinforcement technology for large section coal roadway under great depth and multiple disturbancesSUN Zhi-yong, ZHANG Zhen, GUO Xiang-ping, DING Zi-wei38-4113Feasibility study of dewatering and depressurizing of high pressure roof waterLIU Ji42-4514Cause analysis and countermeasures for water inrush in fully mechanized top coal caving face in shallow coal seam outcrop areaXU Yan-chun, LV Bin, DONG Jian-ping, LIANG Shu-ping46-4915Numerical analysis and application of coal pressure relief effect with drillings in roadwayLI Yue-wen, LIU Sai, CAO An-ye, HUANG Xian-cheng, GU Yu50-5316Major problems and solutions for directional drilling by VLD-1000XIAO Dong-hui, SU Jun-kang, Steve Finch, Chris Freer54-56,6017The method for large inclination fully mechanized working face crossing anticlinesPENG Bo, FAN Ying-chong, YANG Kai57-6018Source identification of mine water inrush based on comprehensive evaluationJIANG Peng61-6419Optimal arrangement of gas drainage drilling based on mining fractured field in fully mechanized top coal caving faceYIN Bin65-6820Analysis and the prevention advice of gas accidents of Guizhou coal mines 2007-2015ZHONG De-yang, LIU Yong, KANG Xiang-tao, GAO Lin69-72