DOI: 10.11799/ce201611008
Research on head sheave platform arrangement of mine head frame
SHI San-yuan
YUAN Rui-yang
LI Guo-li
Abstract:In order to adapt to mine head frame design, the paper proposed the analysis method for existing head frame with the load case combination of current specifications, and analyzed and verified the vertical arrangement method of the skip head sheave and cage head sheave. The results show that, the vertical arrangement skip head sheave and cage head sheave, comparing with conventional arrangement, can meet the requirements with partial reinforcement, which requires small amount of reinforcement material, and has strong applicability with the dependence of terrain greatly reduced.
Keywords:mine head framehead sheave platformskip cagevertical arrangement
Publication Date:2016-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:3( 24-26 )
