Feasibility study of dewatering and depressurizing of high pressure roof water
LIU Ji
Abstract:In order to eliminate the threat of high pressure water in sandstone on the seam roof, the feasibility of the dewatering and depressurizing was determined according to a large underground dewatering test before mining work and observing the water drawdown under different water discharge. The results showed that the total water discharge decreased from 223?2m3/h( Y37-3) to 20~30m3/h and the water pressure from 5MPa to 0?38MPa after dewatering. The decline is obvious, and the dewatering and depressurizing was feasible.
Keywords:roofsandstonehigh pressure waterdewatering testdewatering and depressurizing