1Optimization of braking force distribution ratio of trackless rubber-tyred vehicle considering slopeZHANG Chuan-wei, ZHAO Bin-binSpecial Topic1-3,72Optimization of steering system for an articulated rubber-tyred vehicleWANG Jun-yuan, SONG Hong-kuan, DU Wen-hua, ZENG Zhi-qiang, DANG Chang-ying, ZHANG PengSpecial Topic4-73Application of domestic shuttle car in tunneling of long distance large section coal roadwayMa Jin-gongSpecial Topic8-124Test and research on tribological performance of mine electric locomotive disc brake based on bench methodDONG Li, XING Tong-chao, ZHU Qing-qing, LI Yuan-yuanSpecial Topic13-16,215Analysis and optimization for driving stability of large tonnage articulated dump truck in coal mineWANG Qing-xiangSpecial Topic17-216Development of reducer for shuttle car in mineMA Fu-wenSpecial Topic22-257Battery management system for explosion-proof lithium-ion battery rubber-tyred vehicle based on LabViewHU PengSpecial Topic26-28,338Research on vehicle controlling system of explosion-proof lithium-ions battery vehicleREN Zhi-yongSpecial Topic29-339Comparison and selection of Duanzhai mining field development plansJI Liu-tingDesign Technology34-3710Application of side coal wall mining technology in Wulan Coal MineZHANG De-junDesign Technology38-40,4511Determination of reasonable coal pillar width in No.8 coal seam of Baode Coal MineWANG YuDesign Technology41-4512Mixing and twisting coal bunker coal flow system scheme desighCHENG Zhi-binDesign Technology46-4813Preliminary study and application of dry separation in construction waste treatmentWANG Hong, YUE Shi-song, XU Tie-jianDesign Technology49-51,5514Optimal design for core equipment supporting structure of coal gasification buildingZHAO Dong-meiDesign Technology52-5515Excavation and support technology of cutting hole for the 8.8 m mining height working faceWANG Fu-qiang, ZHENG Jian-ying, CUI Shi-leiConstruction Technology56-6016Supporting scheme optimization for full section rectangular fast tunneling roadwayHAN LongConstruction Technology61-6517Study on stress relief effect of coal body blasting in high stress zone of coal pillarLI Peng, LIU Zhi-gangConstruction Technology66-68,7218Research and application of high prestress and long anchorage technology in Hulusu Coal MineLU Xi-hui, AI Chuan, ZHANG Nong, HAN Chang-liang, SHI Chao-hongConstruction Technology69-7219Study on weak surrounding rock deformation mechanism and control of 310 rail roadway in Xinzhi Coal MineNIU Wei-fengConstruction Technology73-7620Gob-side roadway driving technology with roof-cutting pressure-relieving in deep miningZHANG Shuai, ZHANG Ji-zhou, LI Jian-feng, ZHANG Wei-dongConstruction Technology77-79,82