Rapid Conversion Technology of Production System in Fi rst and Second Phase Projects of Construction MineZHANG Xiu-feng, YANG Yang, XIA Feng1-3
Analysis on Freezing Wall Connection of Mine Main Shaft in Dingjialiang MineCHENG Zhong-hai, ZHU Zong-zhen4-7
Shield Tunneling Technology Applied to Metro Tunnel Passing through under Expressway Tunnel with Shallow Space DepthLI Jian-li, LI Yi8-11
Design and Construction of Ground Freezing Method for Lateral Pump Station in Ultra Deep Metro SystemPANG Tao12-16
Organization Management Enhanced to Improve Construction Schedule and Quality of Mine ShaftJIN Xin, HE Rong-hai, ZENG Qing-xiang, YI Jin-xiang17-18,16
Pre-Grouting at Shaft Sinking Face in Mine Auxiliary Shaft of Shunhe MineBAI Yue-jin, WANG Zun-qi, TIAN Zhi-peng19-21
Controlled Grouting Technology Applied to Handle Water Disaster Accident Occurred from Fully Mechanized Coal Mining FaceYANG Wen-sheng, SHEN Yu-shan, SONG Yi-ping, FANG Zhi-meng, WANG Chun-ming, ZHAO Bin, LI Guo-dong, YANG Chun-lai22-26
Influences and Treatment of High Pressurized and High Flow Underground Water to Mine Shaft Freezing SinkingLI Rui-zhi27-29,41
Research on Spontaneous Combustion of 2-2 Coal Seam Law and Countermeasures in Selian No. 2 Coal MineCHENG Bai-wang, ZHAO Qing-wei, YU Ya-nan30-33,26