Organization Management Enhanced to Improve Construction Schedule and Quality of Mine Shaft
JIN Xin
HE Rong-hai
ZENG Qing-xiang
YI Jin-xiang
Abstract:An organization management of the mine shaft construction is an important link of the capital construction and would have important significances to improve the engineering quality and schedule , to reduce the engineering cost ,to reduce the material consumption and to improve the economic bene‐fit. With the general promotion and application of the mine shaft sinking mechanization ,especially after the project management method promoted ,the discovery and promotion of the related construction or‐ganization management method would be especially important. The mine air returning shaft of Woxi Mine was 994.55 m in depth and the net diameter of the mine shaft was 5.0 m.During the mine shaft construction period ,due to the construction organization management enhanced ,a month average mine shaft complement was over 102 m and a max mine shaft completed was an excellent achievement of a month shaft completed with a depth of 142.2 m.
Keywords:mine shaft constructionorganization managementqualityscheduleeconomic benefit
Publication Date:2015-04-02
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:3( 17-18,16 )
Mine Construction Technology

Mine Construction Technology

ISSN:1002-6029
Year, Vol.(Issue):2015,(3)