1Analysis and discussion on influencing factors of overallplan preparation for coal mining areaHUANG LeiDesign Technology1-32Study and flexible application of mining methodin complicated geological conditionsLI Liang-shanDesign Technology4-63Reasonable position and drainage effect of high level drainageroadway in 13-1 coal seam of Liuzhuang Coal MineMIAO Lei-gang, SHI Bi-ming, QIN Ru-xiangDesign Technology7-94Application of dry magnetic-shift stepless voltage regulation softstarter in mine disaster-resistance drainage systemCAO Ting, XU KaiDesign Technology10-125Design of pressure monitoring platform for hydraulic supportbased on embed system and fieldbusCHU Qi, DING Cheng, LI WeiDesign Technology13-15,196Spatial shape optimization of west boundary slope of Chumei open pit mine in WulantugaZHANG Lei-tao, LI Guang-heDesign Technology16-197Consolidation design for damaged raw coal silo in coal preparation plantLIU XunDesign Technology20-21,248Innovation of coal mine general layout design based on DLDETIAN DongDesign Technology22-249Composite shaft sinking construction technologycrossing quicksand layerZHU Nan-jingConstruction Technology25-2710Mine pressure behavior and roof control of gob-side entry retainingformed by roof cutting and pressure relief in fully-mechanized faceWEI Guang-rong, WANG Qing-xiongConstruction Technology28-31,3511Technological set of gas drainage drilling hole sealing and its applicationLIU Yan-baoConstruction Technology32-3512Study on surrounding rock control technology for roadwayin gently inclined thick coal seamHAO Zhen, ZHU Ying, REN Qian-huaConstruction Technology36-38,4213Combined support technology of bolt-mesh-cable-beamin the three-soft thick coal seamGUO Tao, LI Peng-fei, ZHOU Xiao-longConstruction Technology39-4214Parameter optimization design of roof-weakening blastingbased on PPV safety criteriaXU Xuan, XU Ying, FU Ju-gen, WANG Hai-bo, ZHENG Zhi-taoConstruction Technology43-4515Application of retraction method with five shield supportsin 7m high cutting fully mechanized working faceZHANG Zai-mingProduction Technology46-4816One-off retracting technology of supports for triangle coal recoveryin longwall top-coal caving faceHE Shuang-long, ZHANG Bin-binProduction Technology49-51,5517Coal drawing process optimization of fully-mechanizedtop-coal caving in extra-thick coal seamDENG Wei-yuan, KANG Tian-heProduction Technology52-5518Application of EBH315 type road-header in whole-rock roadwaywith steep slope of Canadian Murrey River Coal-MineZHANG Yan-lu, WANG Xue-chengProduction Technology56-5819Present situation of mine water treatment and reclamationin Southern HebeiLI Fu-qin, ZHANG Chen-xing, MENG Li, ZHANG Shao-feiProduction Technology59-61,6520Side slope stability analysis and prevention countermeasures ofopen pit mine under the influence of collapse columnProduction Technology62-65