1Key points for planning and design of 8.8m ultra large height mining panelYANG Jun-zheSpecial Topic1-52Reformation design and stress analysis of the shearer in 8.8m extra-thick coal seamYUAN Chang-suo, YUN Rui-guangSpecial Topic6-93High-strength cutting system of ultra large mining height shearerBU Chuang, GAO Hong-weiSpecial Topic10-144Research on electrical control system of super high coal shearerSUO Zhi-wen, ZHAO Yi-hui, ZHOU ZhanSpecial Topic15-195Strength analysis of shovel-type support carrierXU Lian-hangSpecial Topic20-256Static and dynamic characteristics of hydraulic independent
suspension of WC100Y support carrierHUANG FeiSpecial Topic26-327Interference analysis of equipment installation in 8.8m
ultra large mining height fully-mechanized faceWANG Jun, CUI Shi-lei, CAO Jian-yunSpecial Topic33-378Application of pump filling pillar in fully mechanized mining
face of Bulianta Coal MineWANG Wei-gangSpecial Topic38-429Location selection and development design of industrial site in Guxian Coal MineGAO FengDesign Technology43-4710Discussion on long distance power supply in fully mechanized coal faceXU KaiDesign Technology48-5011Design Innovation of underground large equipment
assembly station in Licun Coal MineZHI Bao-yanDesign Technology51-5312Numerical simulation of 3D FEM deformation analysis of
coal bunker in Donglutian Coal MineYANG Zhe, CHAO JunDesign Technology54-5813Application of navigation technology for unmanned coal mining under pit slopeLI Wen-guo, LIU xinDesign Technology59-6114Practice of non-pressure three product cyclone in anthracite preparation in Jincheng areaLUO Shi-leiDesign Technology62-6515Drilling technology of ground grouting roof reinforcement for mining
under direct cover of caving zoneZHANG Gui-fang, LU Hai-feng, NIAN Bin, YAO Duo-xi, ZHANG Man-man, LI ChaoConstruction Technology66-7116Application of slitting drilling in roof pre-cracking drilling
construction with 110 methodLI Xu-tao, FAN Tie-jun, LEI-Xiao-hui, WU Yun-pengConstruction Technology72-7517Main haulage roadway construction passing through fault tectonic
zone in south wing of Donghuantuo MineZHANG Lian-weiConstruction Technology76-8018Stress relieving of wide coal pillar using hydraulic fracturing and
water jet in rock burst minePANG Li-ning, LIU Yi-tao, DI Sheng-jun, SU Shi-jie, DING Guo-li, JIANG FengConstruction Technology81-8519Application and effect of radial hydraulic drilling for coalbed
methane in Xishan areaQIAO Jin, LI Rui, WANG Sen, LIU Yan-feng, GAO ChaoConstruction Technology86-9020Mechanism and effect of initial top coal caving with hydraulic
fracturing in Zhangjiamao Coal MineLI Zheng-hu, ZHANG Jun-hui, CHEN Hui, TAN Shuai-jie, WEN Chen, SUN Xiao-long, CHEN HaoProduction Technology91-95