DOI: 10.11799/ce202006017
Main haulage roadway construction passing through fault tectonic
zone in south wing of Donghuantuo Mine
ZHANG Lian-wei
Machine-generated Keywords:
Publication Date:2020-06-28
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:5( 76-80 )
