Interference analysis of equipment installation in 8.8m ultra large mining height fully-mechanized face
WANG Jun
CUI Shi-lei
CAO Jian-yun
Machine-generated Keywords:
Publication Date:2020-06-28
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:5( 33-37 )
Coal Engineering

Coal Engineering

PKUISTIC
ISSN:1671-0959
Year, Vol.(Issue):2020,52(6)