Research on rack foundation design of sliding rail stepping guide for starting TBM in mine inclined shaftMENG Youqiang, SHEN Jianchen, ZHOU Xiaomin et al.Mine Construction Technology2025, No.06002025-11Research and application of drilling process optimization for ground directional plugging of deeply buried water tunnelsGUO Binbin, HE Wen, WANG Xueqiang et al.Mine Construction Technology2025, No.06002025-11Research on safety and rapid excavation support technology of small TBM in coal minesXIE Ping, TANG Bin, WANG Yaoping et al.Mine Construction Technology2025, No.06002025-11Rock creep model based on the theory of fractional derivativesYAN Mengyuan, WANG XiaojianMine Construction Technology2025, No.06002025-11Discussion on design parameters and methods of steel fiber reinforced concrete wall seat in deep freezing shaft liningsLU Junjie, YAO Zhishu, WANG Jiaqi et al.Mine Construction Technology2025, No.06002025-11Experimental study on strength restoration effect of chemically grouted fractured porous sandstone based on temperature gradientXU Shaodong, ZHANG Lei, PAN Huanxi et al.Mine Construction Technology2025, No.06002025-11Discussion on the freezing drilling technology of shafts in Taigemiao mining areaHE Yuqiao, HAN Shengming, LIU Mingliang et al.Mine Construction Technology2025, No.06002025-11Special shaft sinking technology empowers water network construction and drives the Second Curve of the enterprisesFU Qiang, DING HangMine Construction Technology2025, No.06002025-11Evaluation of safety classification of lining cracks in mountain tunnelsWU Xuelan, CHEN Haiming, TIAN Song et al.Mine Construction Technology2025, No.06002025-11Geotechnical and rock testing practice for airport runway engineering investigation in hilly regionsQIU LemeiMine Construction Technology2025, No.06002025-11Numerical simulation of welding process of hydraulic support connecting rod based on SYSWELDDU ShangyuMine Construction Technology2025, No.06002025-11Study on the shear behavior at the interface between surrounding rock and backfill material under varying roughness conditionsSUN Xuqiang, TANG Bin, LIU Xiaohu et al.Mine Construction Technology2025, No.06002025-11Research on segmented downward grouting technology in broken andesitic basalt stratumCHEN ZhenguoMine Construction Technology2025, No.05202025-09The application of digital design in the construction of frozen shaft excavation and liningZHAO Wen, WANG Chao, HE Lihui et al.Mine Construction Technology2025, No.05102025-09Quantitative determination of key parts of surrounding rock prone to instability in deep soft rock roadwayJIANG Dengshun, PENG Cheng, ZHANG JiaweiMine Construction Technology2025, No.05102025-09Optimization research on gas extraction technology from drilling holes in extra thick coal seamZHANG HongjieMine Construction Technology2025, No.05102025-09Research on ground area grouting treatment at Pingmei Shenma Liangbei No.2 Coal MineZHAO Litao, ZHAO Guangmiao, WANG JinzhaoMine Construction Technology2025, No.05002025-09Simulation analysis of rubber cement stabilization gravel dry shrinkage based on Fick's diffusion lawHAN Yanji, FENG Changbiao, LI Zhihao et al.Mine Construction Technology2025, No.05002025-09Overall impact mechanism of isolated coal in deep topsoil fully mechanized caving facePAN Xiaozheng, ZHENG Hongwei, KONG Zhen et al.Mine Construction Technology2025, No.05002025-09Safe construction technology of TBM for hard rock excavation under complex geological conditionsYANG FengMine Construction Technology2025, No.05002025-09