Research and application of drilling process optimization for ground directional plugging of deeply buried water tunnels
GUO Binbin
HE Wen
WANG Xueqiang
KONG Weigang
XIE Fuxing
SHI Yujie
Abstract:To address the challenge of sudden water inflow in the deep-buried tunnels of the Western Trunk Line of the Central Shanxi Yellow River Diversion Project,a surface-directed plugging drilling technique was adopted.The study analyzed the adaptability of drill hole design,drilling equipment se-lection,and drilling construction processes.By optimizing the borehole trajectory and implementing a structural design featuring three-stage borehole diameters and two-stage casing,combined with com-posite drilling techniques and a combination of air drilling and mud drilling,precise trajectory control and efficient drilling were achieved.Field test results indicate that the ground-based directional plug-ging boreholes for the deep-buried water-bearing tunnel on the West Trunk Line achieved a cumulative drilling length of 1 929.94 meters with a 100%success rate.All boreholes precisely penetrated the predetermined tunnel locations,laying the foundation for subsequent aggregate filling and grouting plugging operations.These research findings provide valuable reference for ground-based directional plugging borehole drilling construction under similar conditions.
Keywords:deeply buried tunnelsdirectional drillingcomposite drillingwireless drilling inclination measurement
Publication Date:2025-12-31
Online Publishing Date:2025-11-25(First online date of this platform, not the publication date of the document)
Pages:5( 16-20 )