Construction of Ultra Large Skip Loading Chamber in Mine Full Depth Freezing ShaftWANG Hou-liang, SHI Yun-feng, WANG Jun-yi4-7
Application of Ground Freezing Method to Repai r Project of River Bottom Water Taking TunnelHAO Ming-qiang, SHI Zhi-ming12-16
Application of Comprehensive Grouting and Directional Drilling Technology to Water Sealing of Mine Shaft in Iron MineDU Kai, REN Feng-tong17-19,16
Partial Freezing Construction of Mine Main Inclined Shaft in Lijiaba MineZHAO Yu-ming, ZHANG Xu-zhong, LIU Wei-min, LI Zhi-jun20-24
Reinforcement Technology of Overlarge Chamber Floor with Reinforced Concrete Reverse Arch+Overlong Anchor GroupLIU Hai-sheng, ZHANG Mao-min, YANG Xin-ping25-27,24
Research and Application of Brine Recovery System of Freezing PipeZHANG Qing-wu, DONG Jian-gang28-30,33
Application of Frequency Conversion Technology to Ground Freezing ProjectLI Zi-xiang, WU Sheng-nan, WANG Chun-ling31-33
Experiment Study on Blasting Technology with Medium Depth Borehole in Mine Large Cross Section Rock RiseZONG Qi, WANG Chuan-bing, WANG Hai-bo34-37
Study on Site Measurement of Floor Heave Occurred in Mine Freezing Shaft Sinking in Soft Rock of Western ChinaJIANG Guo-jing, LI Ai-min, NIU Qing-he, GUO Deng38-41