1Necessity and significance of project construction of the River Diversion Project from the Yangtze River to the Han RiverXiao Changhu, Li Bo, Liao Xiaoyong, Zhang Na, Wang Lei, Huang HuiyongPlanning and Design32-352Brief introductions on overall layout of the River Diversion Project from the Yangtze River to the Han RiverWang Lei, Lin Qiusheng, Zhao JianPlanning and Design36-393Optimal water allocations for the River Diversion Project from the Yangtze River to the Han River and demonstration for the project scaleLi Bo, Wei Kai, Cao Zhenghao, Huang Huiyong, Zhang NaPlanning and Design40-434Geological comparison for selection of super long tunnel under the dam of the River Diversion Project from the Yangtze River to the Han RiverWu Shuliang, Deng Zhengrong, Wang Jiliang, Liu Kai, Qi LingxuanPlanning and Design44-475Design of ultra-long burial depth pressure water tunnel of the River Diversion Project from the Yangtze River to the Han RiverWu Song, Han Jian, Yuan Wei, Yan TianyouPlanning and Design48-50,356Main issues with geology for deep buried long tunnel of the River Diversion Project from the Yangtze River to the Han RiverGeng Junmin, Yan Huiming, Jia Jianhong, Li Shiming, Wan YongliangPlanning and Design51-537Eco-environment impacts of the River Diversion Project from the Yangtze River to the Han River and protective measuresLiu Zhaoxiao, Yao Wanyan, Liu YangyangPlanning and Design54-568Preliminary studies on applying digital twin to the River Diversion Project from the Yangtze River to the Han RiverSong Zhizhong, Xie Mingxia, Feng Min, Guan Linjie, Luo Wei, Liu ZijianPlanning and Design57-609TBM equipment and tunneling key technologies for the River Diversion Project from the Yangtze River to the Han RiverYang XuhuiConstruction and Management67-6910Studies on formation of digital twin system in project construction and management of the River Diversion Project from the Yangtze River to the Han RiverSun Ruigang, Tao Shaoxiong, Guan Linjie, Zhang GuoshuaiConstruction and Management70-72