Design of ultra-long burial depth pressure water tunnel of the River Diversion Project from the Yangtze River to the Han River
Wu Song
Han Jian
Yuan Wei
Yan Tianyou
Machine-generated Keywords:
Publication Date:2022-09-27
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 48-50,35 )
China Water Resources

China Water Resources

PKU
ISSN:1000-1123
Year, Vol.(Issue):2022,(18)