Necessity and significance of project construction of the River Diversion Project from the Yangtze River to the Han RiverXiao Changhu, Li Bo, Liao Xiaoyong, Zhang Na, Wang Lei, Huang Huiyong32-35
Brief introductions on overall layout of the River Diversion Project from the Yangtze River to the Han RiverWang Lei, Lin Qiusheng, Zhao Jian36-39
Optimal water allocations for the River Diversion Project from the Yangtze River to the Han River and demonstration for the project scaleLi Bo, Wei Kai, Cao Zhenghao, Huang Huiyong, Zhang Na40-43
Geological comparison for selection of super long tunnel under the dam of the River Diversion Project from the Yangtze River to the Han RiverWu Shuliang, Deng Zhengrong, Wang Jiliang, Liu Kai, Qi Lingxuan44-47
Design of ultra-long burial depth pressure water tunnel of the River Diversion Project from the Yangtze River to the Han RiverWu Song, Han Jian, Yuan Wei, Yan Tianyou48-50,35
Main issues with geology for deep buried long tunnel of the River Diversion Project from the Yangtze River to the Han RiverGeng Junmin, Yan Huiming, Jia Jianhong, Li Shiming, Wan Yongliang51-53
Eco-environment impacts of the River Diversion Project from the Yangtze River to the Han River and protective measuresLiu Zhaoxiao, Yao Wanyan, Liu Yangyang54-56
Preliminary studies on applying digital twin to the River Diversion Project from the Yangtze River to the Han RiverSong Zhizhong, Xie Mingxia, Feng Min, Guan Linjie, Luo Wei, Liu Zijian57-60
TBM equipment and tunneling key technologies for the River Diversion Project from the Yangtze River to the Han RiverYang Xuhui67-69
Studies on formation of digital twin system in project construction and management of the River Diversion Project from the Yangtze River to the Han RiverSun Ruigang, Tao Shaoxiong, Guan Linjie, Zhang Guoshuai70-72