Analysis on Protective Seam Mining Affected to Stability of the Lower Seam Roadway in 1 000 Meters Deep Mine吴俊浩, 靖洪文, 苏海健1-4,36
Full Anchor Support Technology of Mine Roadway with Soft Roof in Stress Abnormal Zone张成军, 吴拥政, 褚晓威8-11
Rapid Construction and Support Technology of Large Span Open-off Cut for Fully Mechanized Caving Mining Face in Thick Seam of Deep Mine安伯义12-14,18
Pilot Long Distance Large Pipe Shield Support Applied to Construction of Mine Inclined Shaft in Deep Overburden Soil金向阳19-21,25
Optimization and Engineering Practices on Support Parameters of Seam Gateway with Broken Roof徐青云, 黄庆国, 刘学文22-25
Experiment Study on Grouting and Pilot Support Plan of Mine Roadway Passing Through Sand Layer韩晓雷, 徐生玉, 李桂贤, 张涛, 贺博26-28,32
Borehole Drilling and Pressure Releasing Technology Applied to Mining Gateway Support in Three Soft Seam李树彬29-32