Scheme design of double-lane strip method for coal mining in irregular areaSHEN Bin-xue, ZHU Lei, ZHANG Xin-fu, GU Wen-zhe, HUANG Jian-bin1-5
Optimization of gangue discharge system in district station and crossheading tunnelingCHEN Ben-liang, WANG Kai-yuan6-10
Treatment and recycling process of mine water in Bailongshan Coal Mine in Eastern YunnanLI Ya-juan, YU Yao-hong, LU Jian, HU Da-long, YANG Yang16-19
Ecological flood control planning for mining areas on the Loess PlateauGAO Zhi-wei, YAO Qing-bao, DONG Zhao-hui20-25
Discussion on application of Design Standard for Heating, Ventilation and Air Conditioning in Coal IndustryWANG Jing26-29
Reasonable width of coal pillar and roadway support in gob side entry of fully mechanized top coal caving in extra thick coal seamHE Fu-lian, LU Heng, QIN Bin-bin, SONG Jia-yu, WANG Bao-qiang30-35
Integrated control technology of roof cutting, bolting and grouting along gob-side entry retained within the lower seam of deep and close distance coal seamsQI Hong-xia, HE Kang, HE Xiang-qian, YANG Shun-chao, ZHANG Yuan42-46
Optimization of compound supporting in large-deformation coal roadway under secondary disturbanceXUE Yan-ping47-51