DOI: 10.11799/ce202109003
Optimization of mining area steering scheme in Shengli No.1 Open-pit Coal Mine
SUN Jun-dong
Machine-generated Keywords:
Publication Date:2021-09-28
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:5( 11-15 )
