System design of mining area-coal mine underground reservoir in Shendong mining areaZHANG Bao, HAO Xiu-qiang, LI Hui-qiang1-6
Optimization of intelligent fully mechanized top coal caving face with large mining height in Caojiatan Coal MineLEI Ya-jun, YAN Shao-hong, WANG Rui, SHEN Yu-peng, HUA Zhao-lai, ZHOU Xiao-po7-12
Optimization on reasonable width of temporary coal pillars in roadway type paste-like backfill miningZHAO Wei-qiang13-18
Intelligent design of coordinated development and production system of coal and coalbed methaneTIAN Jinzhou19-23
Design on coal storage shed with membrane structure supported by frameCAO Hui, XU Tao, SHEN Jin-gang, WANG Hao, MU Ming24-27
BIM model reconstruction of coal preparation plant in construction stageQIAO Sha, ZHANG Shu-sen, GUO Rui, LI Ya-mei28-32
Shaft failure mechanism and comprehensive repair technology in soft rock section of Xinyuan Coal MineLIU Chong37-43
Application of bolt-grouting reinforcement technology for coal pillar in non-equal width section of island working faceZHOU Xian, CHANG Yan, WEI Quan-de, ZHANG Li-ming, WANG Yan-fei, CHEN Yang44-49
Failure mechanism and control measures of floor heave in deep buried soft rock roadwayZHANG Yong, XIE Cheng, SUN Te, ZUO Hai-feng, LIU Guang-rao, YANG Jin-kun, CHEN Yang50-55