Optimization of intelligent fully mechanized top coal caving face with large mining height in Caojiatan Coal Mine
LEI Ya-jun
YAN Shao-hong
WANG Rui
SHEN Yu-peng
HUA Zhao-lai
ZHOU Xiao-po
Machine-generated Keywords:
Publication Date:2022-12-28
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:6( 7-12 )
Coal Engineering

Coal Engineering

ISTICPKU
ISSN:1671-0959
Year, Vol.(Issue):2022,54(12)