Explanation on Three Documents of Mine Emergency Refuge System Construction PlanCHEN Ji-fang, HE Mei-xiang, HUANG Xiao-dong1-3,7
Domestic Equipment Selection for 6Mt/a Working Face in Medium-Thick Seam of Liangshuijing Coal MinePANG Yi-hui4-7
Study on Reasonable Width of Sectional Coal Pillar in Ultra-Close Coal Seams MiningSUO Yong-lu, LIU Jian-dou, ZHOU Lin-shen, MAO Xiao-wa, SHANG Tie-lin8-10,14
Insulation Design Plan of Mine Air-Intake Shaft in Wangzhuang Mine and Analysis on Investment and OperationYAO Xiao-han, ZHAO Yu-dong11-14
Study on Protective Coal Pillar in Underground Coal MiningWANG Lin-qing, LI Dong-wei, WU Kan, DONG Ji-dong18-20
Application of Surface Material Transportation Borehole in Shendong Coal Group CorporationZHENG Fu-wei23-26
Study on Design of Grouting Pad and Rock Cap at Shaft Sinking Face Above High Pressurized Water in Mine ShaftPAN Rui, ZHANG Bing-qi27-29,32