DOI: 10.11799/ce201411004
Insulation Design Plan of Mine Air-Intake Shaft in Wangzhuang Mine and Analysis on Investment and Operation
YAO Xiao-han
ZHAO Yu-dong
Keywords:mine shaft insulationheat pumpenergy savingmine air-intake shaft
Publication Date:2014-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 11-14 )
