2Common problems of mine construction stripping engineering entrusted construction in surface mineMining Engineering5-6,9
3Second stage mining procedure scheme comparison in Shengli donger surface coal mineMining Engineering7-9
6Feasibility study on application of bucket wheel technology in Shengli eastern No.2 surface coal mineMining Engineering15-17
7Scheme analysis of first stage truck selection in Shengli eastern No.2 surface coal mineMining Engineering18-19
8Optimization self-moving crusher system in Shengli eastern No.2 surface coal mineMining Engineering20-21,24
9Hard strata distribution law and treatment measures in Shengli eastern No.2 surface coal mineMining Engineering22-24
10Probing into electric shovel and truck allocation in Shengli eastern No.2 surface coal mineMining Engineering25-26
11Preliminary discussion on the application of earthwork engineering quantity calculation methodMining Engineering27-28
12Effect of winter environment construction work in Shengli eastern No.2 surface coal mineMining Engineering29-30
13Analysis of truck transport capacity in Shengli eastern No.2 surface coal mineMining Engineering31-32
14Electric shovel production capacity in Shengli eastern Mo.2 surface coal mine in WinterMining Engineering33-34
17Boundary optimization of first mining area northeast working slope in Shengli eastern No.2 surface coal mineMining Engineering39-40
20Correct use and maintenance surface coal mine-used construction machinery equipmentElectromechanical and Automation45-47