1Establishment of the corporate culture and the incentive mechanism in engineering survey and design enterprese4-7
5Feasibility study of the fully mechanized sub-level caving method adopted for the high ductility coal seam14-16
9Design of overall steel structure of the mine-use semi-mobile crushing station with capacity of 2500t/h24-26
10Study of the roof-bolting method instead of bolting and shotcrething in supporting of rock roadway27-28
11Post-grouting technology adopted for construction of the bored pile in coal mining engineering29-30
12Design and construction adopting the compact grouting cethod for consolidation of the soft subsoil31-32
13Solidification technology applied for coal exposure in the seams with sudden ooutbust of mehane33-34
15Continuous haulage poeration in the bottom road of coal face in complicated geological condition37-39
17Presureless-feeding heavy-medium cyclone producing clean coal,middlings and refuse at Taiyuan coal preparation plant42-44