5Measurement and analysis of air distribution and the performance of energy saving in a polyfunctional hall with floor air supply49-53
6Realization low lift water supply through installing pump at concentration equipment layer on high-rise building54-55
8The reasons of high coal-consumption of 200 MW-unit and the approach to decreaseSHANG Yu-qin, JIANG Xi-lun, DU Ya-qin59-61