1Analysis and control measures of slope stability in Zhahanao'er Open-pit Mine stope and dumpWANG DongxuMining Engineering1-3,62Semi-continuous mining process matching blasting scheme in Pingshuo East Open-pit MineLIU Xiaoming, QI Maofu, CHENG FeiMining Engineering4-63New equipment selection in Baiyinhua No.2 Open-pit Coal MineXU Baoji, WANG ZhaogangMining Engineering7-9,134Prevention and control measures of spontaneous combustion in Allard mine dumpFENG Ping, HUO Mingliang, BAO YanMining Engineering10-135Analysis on slope stability in Buzhaoba Open-pit Mine of Xiaolongtan Mining BureauJIA JianqiangMining Engineering14-16,206Feasibility analysis on mining No.10 coal in Pingshuo NO.2 underground coal mineHUANG Jian, ZHANG GengMining Engineering17-207Ditch scheme optimization in Luzigou anticline zone of Antaibao Open-pit MineXUE WanhaiMining Engineering21-23,268Analysis on rock mass structure of stope slope in No.3 Open-pit Mine of Huaneng Yimin Coal and Electricity CompanyGUO HongtaoMining Engineering24-269Slope stability analysis based on finite element under underground mining in open-pit mineYAN JieMining Engineering27-3010Research on mining subsidence under open-pit and underground combined miningJIAO Buqing, WANG Yantao, JIAO ZezhenMining Engineering31-3311Slope survey analysis in the open-pit mine stopeMA Ke, WANG YongMining Engineering34-37,40124# coal mining practice in Pingshuo East Open-pit Mine end slopeFENG Mengyu, YAO Guodong, ZHAO Jun, HAN Feng, HE FengMining Engineering38-4013Analysis on dump stability based on limit equilibrium method and FLAC3DXU Peng, MA Junhua, MEN YangMining Engineering41-4414Design on fire fighting water supply system of coal outward transportation channel in Balikun Western Mining AreaJIA ZhenzhenMining Engineering45-4815Boundary survey and shape test of landslide body based on micro seismic monitoring technologyLI MingMining Engineering49-5116Truck matching selection in open-pit mineZHAO Jun, XIAO GuoqiangMining Engineering52-5417Reactive power compensation and optimization of 10 kV power distribution system in mining areasSUN Zhijun, YIN Shiming, ZHANG Yu, BIAN Mingming, GUO XiupingElectromechanical Automation55-5718Application of TSP in advanced geological forecast of Xianrendong tunnelZHANG Kai, MA KeElectromechanical Automation58-6019Analysis on 108 t electric-wheel dump trucks hydraulic system faultLIN Mao, ZHANG Xinzheng, LIU ZengqiuElectromechanical Automation61-63,6720Technical transformation of electric wheel dump trucks wired auxiliary systemCHEN Jianping, HE DongElectromechanical Automation64-67