2Project construction technology of flood-prevention work done on rivers in the plateauGou Tiansheng, Tong Yongping10-12
6Qinghai-Tibet railway Yangbajing tunnel seepage ink control the scheme and constructZhao Xvman21-23,37
8Introduction to the medium- sized structural thing winter construction of the project of the railwayWang Shengtao26-27,40
9The plateau tunnel accumulates the stratum construction technology through the aeolian accumulation,sandJin Bangyuan28-31
11The dealt with the road bed basis of wetlands of Qinghai-Tibet railway 27 marks DK1832 + 220 ~ + 760Li Riwen35-37
12The early strength durability concrete of low temperature does not freeze the application in the spring project of special bridge in the Qinghai- Tibet railwayYang Liwen38-40
1327 bid section wetland bridge construction environmental protection technology of Qinghai-Tibet railwayHuang Jie41
14Substitutes the construction technology of the special bridge of the way with bridge of yhe Qinghai-Tibet railway in DangxiongLiu Yifan42-44
15Have excavated the construction craft in the tunnel of frozen soil district for many years in the Qinghai-Tibet railwayZhao Yanfang45-47
16Manage work of the environmental protection in construction time of Qinghai-Tibet railwayNing Zuochun, Huang Jie48-49
18The rail of Qinghai-Tibet Plateau arranges the anchor firm quality control technology of sulfurLu Zhenhua53-54,59
20Comprehensive construction technology that the plateau is fast to lay a railway trackYin Shelian, Yin Xiaoming60