1Optimized design of rapid mine construction in coal mining area with high gassy and thick overburdenCHEN Ji-huaDesign and Technology5-6,25
2Optimized design of mine surface production system reconstruction in Huayan mineDesign and Technology7-8
3Optimized design of surface railway park for mine auxiliary shaft base on PLC controlDesign and Technology9-11
4Reconstruction of middle pan for scraper chain conveyor with stone foundry pan boxZHAO PingDesign and Technology11-12
5Comments on selection of driving device for belt conveyorLI Gang, LI Hao-yuanDesign and Technology13-14
9Anti earthquake structure measures for buildings constructed with bricks and reinforced concrete and calculation analysis on overlapping area of belt type foundationDesign and Technology21-22
10Design and practical application of deep straight borehole blasting to mine rock roadway constructed with full hydraulic drilling jumboYANG Wen-xin, LIU Pi-liConstruction Technology23-25
11Combined support technology with roof bolting, rib bolting and floor bolting applied to mine roadway with geological structure and high stressed areaWANG Hui, GAO Qun-shanConstruction Technology26-27
12Temporary support technology with bolt and steel mesh for mine arch roadwayHE HuaConstruction Technology28-29
13Fissure control in large volume reinforced concrete construction projectHE Fu-mingConstruction Technology29-30
16Technology for hydraulic powered supports removed from fully mechanized coal mining face under complicated geological conditionsGUO Sheng-liProduction Experience35-36
17Understanding and proposal on water disaster from No.3 seam roof in Dongtan MineProduction Experience37-40
18Typical fault's analytic technology of DC hoist winch electric control systemLIANG Nan-ding, YE Yu-guangProduction Experience40-41
19Application of flame proof crane to underground mine electric charging chamberProduction Experience42-43
20Reconstruction of middlings and clean coal screen system and slime crushing and dry systemProduction Experience44-45