1South slope landslide treatment plan in Pingshuo East Open-pit MineCAI Guangqi, FU Xinhua, XU Jun, DUAN LishiMining Engineering1-32Dumping machine and displacement belt conveyor rising shift in Pingshuo East Open-pit MineZHANG Yingping, LEI Xian, HE JijunMining Engineering4-63Practice on controlling mining technology in soft rock slope open-pit coal mineHAN Meng, JI YushiMining Engineering7-94Research on forming ditch mining area connecting scheme in open-pit mineWANG YongjunMining Engineering10-135Steering sector mining scheme in Pingshuo East Open-pit MineLIU Guo, CAI Guangqi, FU XinhuaMining Engineering14-16,206Mining technology and mining method in Xiwan Open-pit Coal Mine of Yushen mining areaGUO HongtaoMining Engineering17-207Physical and mechanical properties of floor soil rock and weak layer evolution in loess basement dumpYU LingMining Engineering21-238West slope silt area governance method in Yimin Open-pit MineWANG Xixian, LI Wenchao, SUN TaoMining Engineering24-269High-bench blasting parameter optimization in Pingshuo East Open-pit Mine goafCHENG Fei, QI Maofu, XIA Weihua, WANG GentaoMining Engineering27-28,3210Analysis on slope stability based on limit equilibrium method in Huolinhe South Open-pit Mine reviewing platformWANG Moshu, LI Cunjin, AO Qingyou, SHI ChunyuMining Engineering29-3211Selection mode of matching excavator in open-pit mineZHAO Jun, XIAO Guoqiang, YAO Guodong, HAN Feng, HE FengMining Engineering33-3612Application of high density three-dimensional seismic method in Pingshuo East Open-pit Mine goaf explorationWANG Shengyang, XING Ying, DUAN LishiMining Engineering37-39,4213Main mining equipment selection in Thar Block Ⅰ Open-pit Coal MineCAI ZhongchaoMining Engineering40-4214Optimization transformation of life sewage treatment control system in the mining areaZHANG Xuesong, BIAN Mingming, YIN Zhiqiang, GUO XiupingElectromechanical Automation43-44,4915Design of traverse adjustment programREN GuozhuElectromechanical Automation45-4916High-density electrical method BERT structural information joint inversionSHI Hai, MA Ke, ZHANG GuannanElectromechanical Automation50-52,5517Structure optimization of bucket wheel stackerQIN ShuhuiElectromechanical Automation53-5518Discussion on PH2800XPB excavator boom repair technologyHE Dong, ZHANG NingElectromechanical Automation56-5819Effect of load dump truck oil sample chemical examination in the truck repairHUO BingshuaiElectromechanical Automation59-61,6420Application of three dimensional laser scanning technology in Pingshuo Open-pit Mine goaf detectionHU Guoxin, SU Jianjun, ZHAO NanElectromechanical Automation62-64