1Comprehensive gas control in high production and high efficient fully mechanized caving face of Tangshan mine1-4
3Determination of optimized distance between two discs for vertical series disc pipeline conveyor8-10
5Pressure releasing and gas drainage with long bore hole in roof overburden of fully mechanized caving face14-17
20Application and Discussion on floor arch board technology in project with water inrush and swelling soft rock53-55