1Necessity for reconstructing Anjialing mine from an open pit into a combined opencast and underground mine4-6
2Rational equipment selection and capablity matching for the fully mechanized sub-level caving face6-8
4Descrption and appraisal of the accuracy of the control conductor in underground working district11-12
10Vibration load considered in structure design of the main workshop building of coal preparation plant26-27
15Mass concrete construction and temperature measuring technology adopted in construction of the base of Shanghai Zhongmei Mansion37-38
19Optimization study and test of the high-efficient water-reducing agent used for flyash haydite concrete47-49