4Discussion on selection of air cooling system and arrangement of air condenser for 50MW electric power generation unitZHANG Xiao-dan11-13
6Design research on cave and gap backfilling for falling material in goaf of coal mining face to reduce ground subsidence at surface16-18
11Complex foundation with steel scoriae high tamping replacing piles in moisture subsidence powder claySU Guo-quan, YE Hong-dong28-30
14Discussion on surface pregrouting operation and freezing borehole drilling operation for mine shaft at same time34-36
17Comments on application of MNS slime pipeline transportation system in Dongpang Electric Power PlantDONG Guang-yin, WANG Fang-jun41-43
19Bolt-wire mesh-anchor support monitoring and analysis study on the seam roadway for fully mechanized top-coal caving faceZHA Wen-hua, XIE Guang-xiang, HUA Xin-zhu47-50