3Design of Drainage System During Shaft Sinking Period for Mine Main Shaft and Auxiliary Shaft in Chaoyang Coal Mine8-10,7
7Test,Research and Application of New Model Support with Reinforcing Bar,Netting Shell,Bolt and Shotcrete20-23
9Discussion on Application and Dissemination of Valuation Model of Engineering Volume Detailed List in the Mine Construction28-29
12Design and Application on Databank of Monitoring Information for Management System of Tunneling38-40,42