3Study on the rational staggered operation for mining simultaneously the two nearby coal seamsDesign and Technology11-13
4Selection and economic benefit analysis on alternatives of dam water flood prevention project in Ha'erwusu Open Pit MineGUO Zhao-huaDesign and Technology13-15
5Discussion about the time-sharing heat supply of gas-fired boilerZHAN Tuo-huang, WANG ZhengDesign and Technology16-18
6New method and certificate of washability evaluationWANG Jun-qiang, PANG Ding-fengDesign and Technology19-20
7Understanding to Chapter 8.6.3 of "Fire Prevention Code for Architectural Design" and to Chapter 7.4.8 of "Fire Prevention Code for High Civil Architectural Design"Design and Technology21-22
8Design of the fire water supply system for coalmineHUANG Jin-song, ZHU Yu-guangDesign and Technology23-25
10prevention and control of cracks in structures of coal storage yard,coal preparation plantDesign and Technology28-29
12Discussion on design of reinforced concrete site poured hollow cover for buildingDesign and Technology32-34
13To set up management system of mine bolt support roadways for effective control of mine roofREN Hai-qiangConstruction Technology34-36
14Dynamic superposition technology for roof support of high stressed seam gatewayGUO Jian-weiConstruction Technology37-38
15Roof support repair technology for failed gateway under mining strata pressureConstruction Technology39-40
16Analysis on design and construction key point of ground freezing curtain for side way tunnel between Xia Wafang and Bailou in No. 1 Line of Tianjin Metro SystemConstruction Technology41-43
17Optimization on roof strike borehole parameters of gently inclined and high cutting fully mechanized longwall mining faceNI Jin-muProduction Experiences44-45
18Existing problems and improvement measures for application of light weight type hydraulic powered supportGAO Yue-yongProduction Experiences46-47
19Comments on mine water prevention and control method base on practices of water disaster prevention and control in Chengzhuang MineBAI Jian-pingProduction Experiences48-50
20Application of PROFIBUS-DP bus line in coal transportation system of underground mineProduction Experiences50-51