6Construction Technology Straighten-out technology for the deviation of large building and structure caused by underground mining16-18
8Methods for solving the difficult points relating to drilling pile holes by the auger rig in thick and mixed baekfilled ground22-23
14Discussion on the washing and processing alternatives of the coal produced in Yujianliang Mine36-37