1Construction Technology with Running Water Pressure Control Grouting to Rapidly Seal High Pressurized Ordovician Limestone Water Inrush in Underground Mine3-6
2Mine Shaft Back - grouting Technology of Water Control in High Sectional Large Water Inrush in Mine Shaft7-9
3Construction Experience on Full Mine Shaft Drilling Method Rapidly to Pass through Sandstone in Mine Auxiliary Shaft of Banji Mine10-11,6
10Applied Research on Pre - cracking Controlled Blasting Technology with Deep Borehole to Driving of Low Permeability Seam Gateway28-30,40
11Application of Finite Differential Method to Comparison and Selection of Mine Roadway Support Plan31-33,22
12Rapid Mine Shaft Construction Speed with Plane Layout for Rational Optimized Small Diameter Mine Shaft34-36