2Levee Reinforcement on the Yangtze River--A Monumental Work in the History of Levee Construction in China11-14
3Deepened Reform of Levee Construction System--Study on Levee Construction along the Yangtze River14-17
4How Built-in Works Construction on the Main Levees Affects Internal Demand and Economy Expansion17-19
8Build First-class Works, Set up A Monument for High Quality--Report on Levee Construction and Management in Anhui29-31
9Build Grand Levees for the Safety of People--Reinforcement of Levees along the Yangtze River in Jiangxi32-34
10Plan as a Whole, Highlight the Main Point, Hurry up Preparation Work for Guaranteeing Levee Construction along the Yangtze River35-38
13Create New Thought on Water Management, Pay Attention to Ecological System In Levee Construction--Highlight Ecological Environment in Major Built-in Works Struction on the Main Levees along the Yangtze River44-46
14A Brilliant Achievement,A Historical Stride--Report on Levee Construction along the Yangtze River in Hubei47-49
15Practical Study on “Clean Contracts” Used for Built-in Works on the Main Levees of the Yangtze River50-52
16Review on Tender Invitation and Bidding Work of Xingtankou Sluice Reinforcement Project Design53-55
18New Technology of Groove-cutting Applied in Constructing Continues Thin Concrete Seepage-prevented Wall Underground in Built-in Works on the Main Levees of the Yangtze River60-62
19Recent Progress of Test and Study on Non-damage Inspection of Seepage-prevented Walls on Levees63-66
20Study of Quality Inspection and Assessment Method of Built-in Works on the Main Levees of the Yangtze River67-69