2Analysis on cause and countermeasures of as emission increased in mine gas classificationDesign and Technology7-8
3Practices on complex mining technology with increased face width and direction turning for fully mechanized coal mining face in steep inclined seam with double slopesDesign and Technology9-10
5Influences of construction company to mine design and way to reduce influenceDesign and Technology13-15
6Selection and comments on mechanized coal refuse dumping mode at mine surfaceDesign and Technology16-17
7Design and implementation of intrinsic safe power for mine coal mining face base on LM723Design and Technology18-19
9Discussion on solutions of several special problems in environment evaluation of coal refuse-fired power plantDesign and Technology22-24
10Brief introduction on design conception of general plan for railway special line of Shaduenzi MineDesign and Technology24-26
13Water prevention Technology with pre=grouting for working face at base rock section of Suntuan Mine shaftConstruction Technology32-33
14Construction technology of large voume and ultra high pressure water valveConstruction Technology34-36
15Technical study and appliation of retracing the work face fast in fully mechanised longwall of Tang Kou Coal MingConstruction Technology37-39
16Combined repair and reinforcement technology with bolt,anchor and grouting for large cross section srossing point of mine roadwayConstruction Technology40-41
17Application of small diameter pre-stressed anchor support technology to large cross section open-off cutConstruction Technology42-43
19Foundation reinforcement treatment of water treatment workshop in electric power plantConstruction Technology46-48
20Discussion on classification of building site class in building anti earthquake designConstruction Technology49-50