3Speedy roadway development technology integrating the mining,drivage and bolting or the drivage and bolting9-12
6The determining design parameter of moving rise-fall dot foundation of the building on mining cave-in areas18-20
10Shallow scooping-out method to be adopted for deviation rectification of buildings and structures30-33