1Brief introduction of Sino-Coal International Engineering Group and Sino - Coal International Engineering Design & Research Institute4-5
2Review the past,look forward to the future and catch up with the current of time to strive for new achievements6-9
3Considerations on realizing the goal of reducing losses and increasing profits of coal enterprises10-11
6Design reformation and the practice for development and construction of the northern district of Jining mining area18-22
11Design and study of recovering of the rejected coal slime by column flotator at Fenghuangshan mine31-33
14Brief discussion on the vertical layout of the mine's industrial area and the elevation determination in flatlands37-40
16Study and practice of the technology of quick installation of the fully mechanized mining equipment43-44
17Discussion on the interrelationship of the mining operations conducted in upper and lower seams45-50
19Reliability study of the production system using fully mechanized mining with sub - level caving method in parallel operations52-54