3Adapting to Fee-for-Tax Reform, Strengthening Basic Water Infrastructure Construction in Rural Areas7-8
5Implementing the Instructions of the Fifth Session of the 15th CPC Congress Thoroughly, and Bringing Water Resources Development to a New Stage10-10
7Optimising Distribution of Water Resources in Beijing after Water is Available from South-to-North Water Transfer Project14-15
13Experience of Water-efficient Utilization in the Zhang River Irrigation District and its Impaoct26-27
20Strengthening Construction of Non-engineering Measures and Building up a Modern Flood Control System41-42