1Research on development strategy of mining engineering in the Thirteenth Five-Year PlanHE Man-chao, ZHU Guo-longExpert Forum1-62Mine field boundary determination in mine feasibility study reportWANG He-deDesign and Technology7-93Research on rational operation mode of dragline in Heidaigou surface mineZHANG Rui-xin, SUN Jian-dong, WEN Xiao-ke, MA Xin-gen, ZHANG ShuaiDesign and Technology10-134Size determination of narrow coal pillar in gob-side roadway driving in Chengzhuang coal mineXU Guang-liangDesign and Technology14-165Study on coal mine reorganization and expansion mode in Pingdingshan mining areaLIANG Jian-min, XIN De-lin, ZHANG Zhong-wenDesign and Technology17-19,236Selection and driving mode research of super-heavy-duty scraper conveyor in 10-million-ton coal mineZHANG Jin-huDesign and Technology20-237Design reliability analysis and application of high concentration cementation stowing hydraulic support for coal mineYANG Peng-fei, YANG Bao-gui, PENG Yang-hao, YANG Jie, SUN Xue-kaiDesign and Technology24-278Selection calculation of FRP composite guide for coal mine deep vertical shaftWANG Shu-leiDesign and Technology28-30,349Design of mine automatic drainage control system based on safety and energy savingKOU Yan-fei, YANG Jie-ming, KOU Zi-mingDesign and Technology31-3410Personnel transportation mode selection of district raise in Sanbaizi coal mineZHAO Zhen-yuDesign and Technology35-3611Application of large diameter cyclone classifier in coarse slime separation systemLI Bing-cai, ZI Tao, HAN Heng-wang, ZHOU Yu-jieDesign and Technology37-39,4212Discussion on environmental protection in mine industrial site layoutSONG Chun-lanDesign and Technology40-4213Inner force analysis of large diameter concrete silo wallZHANG Zhen-yu, FU Qing-wangDesign and Technology43-45,4814Design of frame membrane structure scheme for enclosed coal yardLI Da-han, LI Jia-weiDesign and Technology46-4815Combined support technology of pipe shed steel arch and anchor cable in large drop fault groupSHAO De-sheng, ZHA De-qiu, YANG Zhang-jie, WANG Wei, WANG Qing-niu, WANG Fu-haiConstruction Technology49-51,5516Application of flexible template gob-side entry retaining in Shendong mining areaCUI Shi-lei, SHE Yong-ming, BIAN Chun-lin, CUI Dong-liangConstruction Technology52-5517Support technology for large section roadway crossing thrust fault fracture zone with large dropTAO Wen-bin, MA Hai-feng, LUO Yong, HU WeiConstruction Technology56-5818Mechanism of mining roadway deformation and failure under dynamic pressure and the reinforcement technologyZANG LongConstruction Technology59-61,6519Study on occurring mechanism and prevention of rock burst in extra-thick steep coal seam in southern area of Wudong coal mineLIU Xu-dongConstruction Technology62-6520Application of hydraulic fracturing and permeability improvement technology for low permeability coal seamLI Jing-guo, DAI Guang-long, LI Qing-ming, CHEN Hu, ZHAO JunConstruction Technology66-69