1Accuracy evaluation of 3D geological model of open-pit coal mineGUO QiangTheory and Research1-62Study on the failure mechanism of local steep slope mining of anti-dip slope based on FlAC3DMA Wencheng, ZHAN Gang, XIANG Yong, WANG Lianzhi, WU Xiaobing, YAN Jie, JIA ZhengzhaoTheory and Research7-113Study on deformation mechanism of weak layer slope with mudstone under rainfall infiltrationMA Minghong, WANG Dan, WANG Zhenwei, LI Yuanhao, CHEN QiTheory and Research12-154Study on slope stability in Xiamen Sandaogou building stone open-pit mineYAN DongjinTheory and Research16-195The application effect of ecological restoration technology in the dump of open-pit coal mine in northern grassland areaZHOU Guochi, MAO Hongyu, XIN JianbaoTechnology and Application20-246Intelligent construction technology of mobile bench excavation in open-pit coal minesZHANG ShuaiTechnology and Application25-287Digital construction information management platform for open-pit coal mines based on Beidou intelligent navigationZHANG KeTechnology and Application29-338Current situation of ecological restoration key technologies in open-pit mine dump of arid regionTIAN GuangTechnology and Application34-389Application of construction safety technology in stripping engineering of open-pit coal minesDOU ZhiwenTechnology and Application39-4210Application research on slope coal mining technology in Wucaiwan No.1 Open-pit Coal MineZHAN Gang, CHEN Dongqu, WANG Jian, WANG Kai, WEI Qiangming, YAN Jie, NIAN XiboTechnology and Application43-4711Diving control mechanism in Shitoumei Open-pit Coal Mine of Santanghu mine areaZHAO Jianzhong, LIU HanchengEngineering and Practice48-5112Analysis and evaluation of slope stability in goaf of Wunugetushan copper molybdenum mineSONG XingfuEngineering and Practice52-5613Formation cause and treatment of silt pump blockage in the bottom drainage system of Xiaolongtan Open-pit MineLI ChaozeEngineering and Practice57-6114The problems and countermeasures in the construction of green mines in open-pit mines of Liaoning ProvinceSHENG ShiboEngineering and Practice62-6515Stability analysis and optimization of non-working slope mudstone slope in Muyin Open-pit Coal MineJIANG Zhonghua, BAI WenzhengEngineering and Practice66-7016Methods to achieve high grade coal supply in Yimin Open-pit MineZHANG LingtongEngineering and Practice71-7417Methods on reducing the blasting bulk rate of Haifeng Open-pit MineSONG Fanping, LIU Mingfeng, NIU Huamig, CHEN Kun, CHEN Jian'an, HU KunlunEngineering and Practice75-7918Study on west slope dumping pressure side scheme of Wucaiwan No.1 Open-pit Coal MineWANG Jian, XIANG Yong, WANG Lianzhi, Maierbieke·duishanhan, LIN Yongchao, YAN Jie, YANG KeyiEngineering and Practice80-8319Identification of safety distance of open-pit mine external dump based on SIGMA/WZHAO LichunEngineering and Practice84-8720Optimization on stability control scheme for north slope of Xianfeng Open-pit MineWANG Dan, WU Chen, LYU Boning, JIANG Xianglian, LIN LingxinEngineering and Practice88-91