2Analysis of internal waste dump slope stability using ANSYS numerical simulation methodMining Engineering5-6
3Determination of south slope final mining boundary in Fushun eastern surface mineMining Engineering7-9
4Guidance of surface mine deposit drainage using synchronization drawdown theoryMining Engineering10-11
5Research on development planning scheme of continuous process belt conveyer in Longqiao dumpMining Engineering12-14
8Automatic searching most dangerous sliding surface of a homogeneous slope based on Bishop methodMining Engineering20-21,24
10Combination mode conception of semi-continuous technology under given conditionsMining Engineering25-26,29
11Preliminary discussions on fault distribution law and the influence to the mining in Chuanshan mining areaMining Engineering27-29
12Application of TSD advance geological prediction system in Yingzuiyan tunnelMining Engineering30-31,34
17Fault diagnosis method and application of P&H2800XP excavator over-currentElectromechanical and Automation42-43,60
18Probing into railings reservoir security situation in Zhejiang provinceSafety and Environmental Protection44-46
19Excavator fault analysis and prevention in Pingshuo mining areaSafety and Environmental Protection47-48
20Probing into power plant waste water treatment performance by ultra filtration-reverse osmosis processesSafety and Environmental Protection49-51,60