1Dynamic Analysis on Low-temperature Oxidation of Coal Based on Static Oxygen-consumption ExperimentTest and Research1-3,6
2Study on Distribution Regularity of Coal-body Gas Pressure near Coal Draw-point in Early Stage of Caving MiningTest and Research4-6
3Simulative Study on Gas Pressure Distribution Based on Lattice Boltzmann MethodTest and Research7-9,13
5Numerical Simulation on Roadway Fracturing Process and Support in Fractured Zone of Steep SeamTest and Research14-16,19
7Research and Application of Mine Low-temperature Refrigeration Cooling by Heat-Power-GlycolTest and Research20-22,25
8Research on Gas Control of Extra-thick and Inflammable Coal Seam by Caving MiningTest and Research23-25
9Evaluation of Mine Ventilation System Based on Gray Cluster Analysis and Fuzzy Comprehensive EvaluationApplication Techniques26-28,41
10Optimum Design of Mine Flameproof Enclosure Based on Three-dimensional Body Finite Element AnalysisApplication Techniques29-31,41
11Application of Isotopic Technique in Identification of Mine Water Inrush SourceApplication Techniques32-34
12Study of Coal Mine Emergency Rescue Information Management System Based on NET PlatformApplication Techniques35-37
13Application of Matter-Element Model in Evaluation and Prediction of Seam Roof StabilityApplication Techniques38-41
14New Control Technology for High Temperature and Heat Harm during Mine ConstructionTechnical Experience42-44
15Application of Dynamic Pressure Infusion in Gentle Inclined Seam by Long HolesTechnical Experience45-47
16Application of Combined Support Using Rock Bolt, Cable Anchor,Shotcrete and Bolting Wire Mesh and Metal Strip in Soft-rock Dynamic-pressure RoadwayTechnical Experience48-49
17Roof Control Technology for Second-mining Face of Lower Slice of Thin SeamTechnical Experience50-51
18Study and Practice of Flocculating Settlement Test of Coal-slurry-water in Moxinpo Coal-preparation PlantTechnical Experience52-53,57
19Influence of Gas Release Time from Borehole on Coal-seam Gas-pressure MeasurementIssue Discussion54-57
20Study on Construction of Early Warning System of Floor Water Inrush in Mine Working FaceIssue Discussion58-60