3Viewing the integrated administration of the mouth of three rivers from the dredging in Duliujian River10-11,13
4The impact of development and utilization of Ziyaxin River flood flowing beach on flood flowing in river courses12-13
5The Characteristics of water project construction and administration in Haihe River Water Conservancy Commission and its thoughts14-16
7The practices and research on construction and administration of yearly maintenance for flood control and water ruined emergency Some practices and thoughts about administration of Yuecheng Reservoir19-20
9Discussing the application of ISO9002 in the management of documents and data for supervision and administration of water projects22-23
14Primary discussion on the existing problems and suggestions of water administration enforcement in basic level water departments35-36
15Intake system program and hydraulics research of first class pumping station in south main line of Wanjiazhai Water Division Project of Transferring Water from Yellow River to Shanxi Province37-39
16Hydraulic structure design characteristics of Jielong hydropower station in Gangba County in Tibet40-41
17Conscientiously drawing up reservoir emigrant planning, solving the problem left over by emigration42-43
18The application of electronic maps in flood control operation administration for flood detention basin44-45,47