1Applying the Existing Production Level to Forecast the Water Inflow of East Wing Ⅱ Area Coal Seam1-4
7Management and Key Technology Of Rapid Construction of Cross-Bridge in City-Case Analysis of Jinci Hotel Cross-Bridge23-25
8Discussed shallowly affects the CFG pile construction several geologic factors and the processing approaches26-29
11On The Sudden Change of Joint Velocity During Fault Tolerant Operations for Manipulators with Mul Tiple Degrees of Redundancy37-40