Study on crane scheduling of flexible manufacturing workshop
WANG Ao-sheng
WANG Xi-jian
Abstract:There are problems of crane random scheduling of flexible manufacturing in the marketing manage-ment mode.The crane scheduling objective is analyzed by mathematical model to describe workshop produc-tion.In order to improve the overall efficiency of workshop,the constraints and scheduling priority principles are given of crane scheduling,to meet flexible manufacturing requirement.
Keywords:flexible manufacturing workshopcrane schedulingAgentmathematical model
Publication Date:2014-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 52-55 )
