Discussion on the construction ideas and pathways of the national water network dispatching and command system
LI Yunling
SONG Qiubo
LIU Weifeng
GUO Xuning
LI Yuanyuan
Abstract:With the acceleration of national water network planning and construction,the transition from single-project and single-basin management to unified water network dispatching has become increasingly urgent.Accelerating the establishment of the national water network dispatching center,big data center,and basin sub-centers,as well as constructing the national water network dispatching and command system to enhance the intelligence level of water network dispatching management,are important tasks outlined in the National Water Network Construction Plan.To support the construction of the national water network dispatching and command system and fully leverage the overall efficiency of water network dispatching and operation,this paper delves into the conceptual connotation and functional roles of the system.It systematically analyzes the overall framework from aspects such as construction foundation,construction goals,guiding principles,and structural framework.The paper proposes pathways for constructing the system,including improving the legal and regulatory framework,establishing technical standards,optimizing dispatching schemes and rules,and strengthening operational support.Furthermore,it identifies five key relationships that need to be carefully managed during the construction process:multi-level water network dispatching coordination,interest coordination between water source and receiving areas,prioritization in multi-source allocation,multi-department and multi-objective trade-offs,and the delineation of dispatching authority between central and local governments.The aim is to enhance the operational efficiency and effectiveness of the water network through a well-constructed national water network dispatching and command system,thereby providing robust water security support for the country.
Keywords:national water networkdispatching and command systemconstruction ideasoverall frameworkpathways and direction
Publication Date:2025-06-12
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:7( 1-7 )